City of La Puente - Installation of Compressed Natural Gas (CNG) Fueling System

Contract Number
075
MSRC Award
$9,200.00
Project Background

The contractor installed a compressed natural gas (CNG) fueling system at its maintenance site, located at La Puente Park. The city operated three alternative fuel vehicles. The slow-fill system will enable the City to refuel these vehicles on-site in a secured facility rather than having to travel to a fueling station approximately ten minutes away. The project includes the design, purchase, and installation of a slow-fill CNG fueling system that can accommodate up to four vehicles. Contractor constructed a structure to accommodate the fueling system and the vehicles.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Cost Description

46000.00

Project Implementation

The City of La Puente had three alternative fuel vehicles in use. The City benefited from their lack of emissions. Neighboring communities obtained a benefit from the lack of emissions as well.

Project Results Description

This was an infrastructure project. Emissions were not calculated.

Project Status Description

Cost breakdown, construction details, and funding information.

Project Year
Summary Approved
No
Total Project Cost
$46,000.00
Co Funding Amount
$0.00
Contractor Address
15900 E. Main Street
Contractor Agency
City of La Puente
Contractor City
La Puente
Contractor Contact
Dan Chadwick
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
75
Contractor Zip
91744
Final Approval Date
Final Report Approved
No