CNG Stations/Purchase 4 CNG Vehicles

Contract Number
S0109
MSRC Award
$134,387.00
Project Background

The City of Lakewood is committed to improving air quality and recognizes that the use of alternative fuel vehicles is critical to achieving regional air quality goals.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project City
Lakewood
Project Cost Description

283427.00

Project Implementation

The City of Lakewood prepared and issued a bid package. An award was made to the lowest responsible bidder.

Project Objectives

The purpose of this project was to install two Fuel Maker compressed natural gas (CNG) fueling stations at two field operations locations within the City and to purchase four alternative fuel vehicles to replace aging gasoline powered vehicles. New vehicles include two Ford F-150 dedicated CNG pick-up trucks, one Ford E-350 dedicated CNG cargo van, and one Ford E-450 dedicated CNG Cutaway van with utility box.

Project State
California
Project Status Description

The Fuel Makers have been installed at the Citys field operations locations at Arbor Road and Nixon Street. The Arbor Road location houses a compressor capable of slow filling six vehicles at a time and the Nixon Street facility can accommodate 10 vehicles at a time. Both locations house a 30-gallon fast fill unit capable of dispensing 15 gallons to be used as emergency back up. Vehicles are in service.

Project Year
Project Zip
90713
Summary Approved
No
Total Project Cost
$283,427.00
Co Funding Amount
$149,040.00
Project Category
Contractor Address
5050 Clark Avenue
Contractor Agency
City of Lakewood
Contractor City
Lakewood
Contractor Contact
Harold Marlar
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
0
Contractor Zip
90713
Final Approval Date
Final Report Approved
No