Design and Construct a Photovoltaic Recharging Station

Contract Number
94009
MSRC Award
$100,000.00
Project Background

Contractor designed and constructed a photovoltaic (PV) system to serve as an accessible public recharge station for an electric vehicle service fleet of the Azusa Light and Water Department as well as to conveniently serve the future privately owned electric vehicles in Azusa, throughout the San Gabriel Valley and surrounding areas.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Cost Description

225000.00

Project Implementation

The charging station is in Azusa, but is expected to be of use to drivers throughout the San Gabriel Valley and beyond.

Project Results Description

Estimated emission reductions are: NMOG, 106 pounds per year; CO, 4,500 pounds per year; NOx, 396 pounds per year; and ROG 461 pounds for year.

Project Status Description

Design of the station, engineering description of the photovoltaic system, and descriptions of the equipment purchased.

Project Year
Summary Approved
No
Total Project Cost
$225,000.00
Co Funding Amount
$0.00
Contractor Address
777 N. Alameda Avenue
Contractor Agency
City of Azusa Light & Water Department
Contractor City
Azusa
Contractor Contact
Joseph Hsu
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
94009
Contractor Zip
91702
Co Participants
Guy Coons Construction, Inc.
Final Approval Date
Final Report Approved
No