Construct LNG/CNG Station

Contract Number
ABL0216
MSRC Award
$76,792.00
Project Background

The City of San Bernardino worked closely with SANBAG and the Interstate Clean Transportation Corridor (ICTC)to obtain funding to construct a new liquified natural gas (LNG) and compressed natural gas (CNG)fueling station in San Bernardino. The new fueling station is located at 187 South Pershing Avenue, less than a mile east of Interstate 215 and three miles north of Interstate 15.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project Address
187 South Pershing
Project City
San Bernardino
Project Cost Description

1387906.00

Project Implementation

The City was assisted by ICTC during the initial conceptual development and grant funding stages. Gladstein, Neandross, and Associates was hired for preliminary design, project development and oversight. Golden Acquisition Corp. dba EFS west performed design and constrution. Nexgen Fueling/Chart Industries was responsible for the LNG/CNG mechanical equipment.

Project Objectives

The new LNG/CNG fueling station will make LNG fueling available along the Interstate Clean Transportation Corridor for LNG trucks traveling throughout California and into Reno, Las Vegas and Phoenix. The City of San Bernardino will also benefit from the station by having LNG fuel available to its current fleet of 20 LNG refuse haulers. The station will allow the City to eventually convert its fleet of more heavy duty diesel refuse trucks to LNG. When the vehicle replacement is complete the City will have more than 100 LNG powered vehicles making it the largest public fleet in the area.

Project Results Description

The LNG storage tank has a 15,000 gallon capacity and CNG ground storage containers have 36,000 standard cubic feet capacity. The single hose LNG dispenser fuels LNG trucks at a rate of 25 gallons per minute. The station has a universal card reader which accepts Visa, Mastercard, and Voyager to allow public access to the station and record fueling transactions.

Project State
California
Project Status Description

The station opened for operation on December 1, 2007, with 20 City trucks fueling with LNG and 22 City vehicles fueling with CNG. CNG vehicles include two large street sweepers and two medium sized refuse trucks. 16 more vehicles are scheduled to be delivered in spring of 2008. The station is also open to the public. The facility is operational however has had some problems with the alarm system that the City and EFS have been working to resolve.

Project Year
Project Zip
92418
Summary Approved
No
Total Project Cost
$1,387,910.00
Co Funding Amount
$1,322,220.00
Contractor Address
300 North D Street
Contractor Agency
City of San Bernardino
Contractor City
San Bernardino
Contractor Contact
James Sharer
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
0
Contractor Zip
92418
Co Participants
San Bernardino Association of Governments (SANBAG)
South Coast Air Quality Management District (SCAQMD)
Final Approval Date
Final Report Approved
No