Rossmoor Pastries Construction of CNG Fueling Station

Contract Number
MS06050
MSRC Award
$18,750.00
Project Background

Rossmoor Pastries desired to do its share to reduce pollutants contributing to air pollution in the South Coast Air Basin. After much thought, Rossmoor Pastries decide to "go green" by purchasing an entire fleet of CNG vehicles consisting of eleven trucks and one car. To fuel its fleet, the bakery also installed a CNG fueling station to allow convenient fueling of the CNG trucks that deliver its pastries, cakes, and sweets.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Other Information
The implementation of alternative fuel infrastructure is an essential enabling element of an overall alternative fuel vehicle strategy. To avoid potential double counting of emission benefits, quantified reductions in criteria air pollutants are credited to the low emission alternative fuel vehicles operated by Rossmoor Pastries as opposed to the infrastructure.
Project Address
2325 Redondo Avenue
Project City
Long Beach
Project Cost Description

75000.00

Project Implementation

The CNG Refueling Station was constructed by S-W Compressors, JB Construction, and Tom's Construction. The station consists of a C-140 Bauer Compressor producing 14 SCFM from an inlet pressure of 5 psi. It also includes three (3) dual time fill posts with 2 hoses each on retractable hose reels to allow as many as 6 vehicles to refuel overnight.

Project Objectives

The objective of this project was to install a limited access CNG Refueling Station including compressor and three fill posts at the Rossmoor Pastries bakery located at 2325 Redondo Avenue, Signal Hill, California.

Project Results Description

Rossmoor Pastries states that it is one of the first private fleets in Long Beach to go forward with natural gas vehicles. The bakery purchased its first CNG van at auction and was very pleased with its performance. This led to the purchase of ten more CNG vans and a Crown Victoria, as well as the installation of the CNG fueling station. Charles Feder, owner of Rossmoor Pastries, states that this is an opportunity to do his part to leave his grandchildren a better environment to live in.

Project State
California
Project Status Description

The limited access CNG Refueling Station is complete and operational.

Project Year
Project Zip
90755
Summary Approved
No
Total Project Cost
$75,000.00
Co Funding Amount
$56,250.00
Contractor Address
2325 Redondo Ave
Contractor Agency
Rossmoor Pastries
Contractor City
Signal Hill
Contractor Contact
Charles Feder
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
0
Contractor Zip
90806
Final Approval Date
Final Report Approved
No