Install CNG Station at Van Nuys Yard

Contract Number
ML07034
MSRC Award
$0.00
Project Background

The Van Nuys Yard is one of many yards operated by the City of Los Angeles, Department of Public Works, Bureau of Street Services. It is the base of operations for a variety of street maintenance activities for the Van Nuys area of Los Angeles. The yard serves as the home base for a fleet of six (6) street sweepers as well as several medium and heavy duty vehicles. In accordance with AQMD Fleet Rules, the City of Los Angeles has been actively retiring its fleet of diesel-powered sweepers and medium and heavy-duty vehicles and replacing them with natural-gas powered models. The City of Los Angeles has embarked on an ambitious program to install fueling infrastructure at several City yards, including a CNG fueling facility at the Van Nuys Yard. Initial planning and design for the project began in January 2007, with the Citys Department of Public Works-Bureau of Engineering handling preliminary design activities. A Request for Bid was issued in January 2009 with a contract awarded to the successful bidder, Golden Acquisition Corp (dba EFS West) in July 2009. Construction activities began in late July 2009.

Emission Tons CO Annual
0.00
Emission Tons CO Total
0.00
Emission Tons NOX Annual
0.00
Emission Tons PM Annual
0.00
Emission Tons PM Total
0.00
Emission Tons Rog Annual
0.00
Emission Tons Rog Total
0.00
Project City
Van Nuys (Los Angeles)
Project Cost Description

0.00

Project Implementation

Construction is complete and the project has been accepted by the City. The station is now under a one-year warranty period.

Project Objectives

The objective of this project was to provide a time-fill CNG fueling station to provide fuel to eight (8) CNG vehicles. In addition, a limited fast-fill dispenser would be provided in order to provide ""spot" fueling as needed. The scope of this project included: installation of 50 SCFM compressor, gas dryer, storage tubes, four dual-hose time fill posts, one limited fast-fill dispenser, and alarm systems, fencing, signage, and emergency shut down devices. In addition, the contractor provided training to City staff of the operation and function of the fueling system.

Project Results Description

The station has been successfully constructed and is now capable of providing time-fill CNG fueling and as-needed "spot" fueling to the fleet of CNG vehicles based at this yard.

Project State
California
Project Year
Summary Approved
No
Total Project Cost
$0.00
Co Funding Amount
$0.00
Project Category
Contractor Address
111 East First Street, 6th Fl
Contractor Agency
City of LA, Dept of Gen Services
Contractor City
Los Angeles
Contractor Contact
Steve Hillman
Contractor Country
United States of America
Contractor State
CA
Contractor Phone
Contractor ID
0
Contractor Zip
90012
Co Participants
City of Los Angeles Department of Public Works, Bureau of Engineering Gary Lee Moore, City Engineer City of Los Angeles Department of Public Works, Bureau of Contract Administration John L. Reamer, Jr., Director City of Los Angeles Department of Public Works, Bureau of Street Services William Roberston, Director City of Los Angeles Department of Water & Power Austin Beutner, General Manager City of Los Angeles Department of Building & Safety Robert Bud Ovrom, General Manager Golden Acquisition Corp. (dba EFS West) General Contractor Gladstein, Neandross, and Associates Project Consultant
Final Report Approved
No
Start Date
End Date